Dashboard
CASE STUDY · TIARRA RESTOBAR
SAVED 10:41 · REV 12
DRAFT
IN REVIEW
PUBLISHED
Approve & publish
TITLE
FDAS and electrical works turned over at Tiarra Restobar
REPLACE
CROP
COVER · PANEL BOARD, TIARRA RESTOBAR · 03.2026

A hospitality site in Bulacan needed addressable fire detection and a full electrical fit-out before opening. The scope covered the panel schedule, wiring devices, and an FDAS loop across dining, kitchen, and back of house.

Detectors were mapped one to one on the reflected ceiling plan, and the loop was tested zone by zone with the local fire marshal present.A. LIM EDITING

GALLERY BLOCK · 4 PHOTOS
+ ADD
+

Permits were processed in-house and the works were signed and sealed by our licensed engineers. The site opened on schedule in March 2026.

+ TEXT + PHOTO + GALLERY + STAT STRIP + QUOTE
METADATA
SLUG
/news/fdas-electrical-tiarra-restobar
CATEGORY
Project Updates
TAGS
FDAS × ELECTRICAL × BULACAN × + TAG
RELATED PROJECT
Tiarra Restobar, Bulacan
SEO SNIPPET PREVIEW
FDAS and electrical works turned over at Tiarra Restobar
dstci.com.ph › news › fdas-electrical-tiarra-restobar
Addressable fire detection and electrical fit-out for a Bulacan hospitality site, permits signed and sealed in-house. Opened on schedule, March 2026.
TITLE 52 / 60
DESC 138 / 160
WORKFLOW
Draft · J. SANTOS · JUL 18
In Review · A. LIM · JUL 23
Published · PENDING APPROVER
← Directory